Small Scall Mining Stamp Mill Design

We're here to help:
Easy ways to get the answers you need. Service Online

Extend the life of Small Scall Mining Stamp Mills

        

In order to ensure that the Small Scall Mining Stamp Mill is better in the continuous operation of the grinding production line and extend the service life of the equipment, the user should carry out regular maintenance and maintenance.

After the new machine is put into operation, it is necessary to carry out a comprehensive inspection of the Small Scall Mining Stamp Mill at the end of each shift. After a weekly operation, perform a comprehensive inspection of the motor and lubrication of the Small Scall Mining Stamp Mill. The contents of the inspection include the fastening of the fixed part, the belt drive, the bearing seal, the wear of the lining plate, the full-position inspection, and the maintenance and replacement of the rail system in accordance with the inspection cycle.

Routine inspection and maintenance shall include the adjustment of the gap between the grinding roller and the lining of the Small Scall Mining Stamp Mill, timely replacement of wearing parts, inspection of the plate hammer, lining plate, bearing temperature and so on.

When the grinding roller of the Small Scall Mining Stamp Mill is running, the gap between the grinding roller and the lining cannot be adjusted. If the material is stuck between the counterattack plate and the plate shell, it is recommended to slightly raise the counter-attack between the re-adjustment gaps, so that the feed of the block will become loose and the counter-attack frame can be easily adjusted. If the degree of counterattack is not sufficient, you can pat on the loose lever (protected with a piece of wood). The gap between the roller and the lining is done by the beam-clamping device of the Small Scall Mining Stamp Mill. First loosen the bolt sleeve and then roll it long. Nut, at this time the rod will move upwards, and the screw sleeve will be tightened.

When the Small Scall Mining Stamp Mill replaces the consumables, first open the rear shelf. When using, first remove the connecting bolts of the rear upper frame and the middle case, then use a wrench to screw the hex head part of the flip device, and then the upper frame is drooped open. At the same time, the rear frame can be hoisted by the suspension above the rack. Repeat the above process, that is, close the upper shelf. When the Small Scall Mining Stamp Mill hammer is worn to a certain extent, it should be adjusted or replaced in time to avoid damage to the fasteners and other components. After opening the upper cover and removing the opening pin, slotted nut and bolt for fixing the lining, the worn lining can be replaced. If installing a new liner, invert the above steps immediately. In addition, in the usual operation, the bearing temperature of the Small Scall Mining Stamp Mill should be checked in time. If the abnormality occurs, it is likely that there is too much or insufficient grease, or the grease is dirty, and the bearing may be damaged. Check the amount of grease in time, or replace grease, bearings, etc.

If you want Small Scall Mining Stamp Mill to have long service life and high production efficiency in the milling production line, SBM reminds you that it also requires you to pay more attention to maintenance and maintenance during daily use.

Send A Message

You can get the price list and a SBM representative will contact you within one business day.